Research Article
An Inventory-Theory-Based Inexact Multistage Stochastic Programming Model for Water Resources Management
Table 5
Solution of the IB-IMSP model (period 2).
| Water flow level | Probability | Joint flow | Optimized transferring water (106 m3) | Optimized transferring batch (103 m3) | Optimized transferring period (hour) |
| L | 0.04 | L-L | | | | L | 0.12 | L-M | | | | L | 0.04 | L-H | | | | M | 0.12 | M-L | | | | M | 0.36 | M-M | | | | M | 0.12 | M-H | | | | H | 0.04 | H-L | | | | H | 0.12 | H-M | | | | H | 0.04 | H-H | | | |
|
|