Research Article

Precise and Accurate Job Cycle Time Forecasting in a Wafer Fabrication Factory with a Fuzzy Data Mining Approach

Table 4

The differences between the proposed methodology and the previous methods.

MethodVariable replacementJob pre-classificationJob post-classificationDetermining the bounds

SOM-WM, kM-FBPN, Look-ahead SOM-FBPNNoYesNoNot discussed
Post-classifying FBPN-BPNNoNoYesNot discussed
Bi-directional classifying FCM-FBPN-RBFNoYesYesNot discussed
BPN-NPNoNoNoDifficult
The proposed methodologyYesYesYesEasy