Research Article
Precise and Accurate Job Cycle Time Forecasting in a Wafer Fabrication Factory with a Fuzzy Data Mining Approach
Table 4
The differences between the proposed methodology and the previous methods.
| Method | Variable replacement | Job pre-classification | Job post-classification | Determining the bounds |
| SOM-WM, kM-FBPN, Look-ahead SOM-FBPN | No | Yes | No | Not discussed | Post-classifying FBPN-BPN | No | No | Yes | Not discussed | Bi-directional classifying FCM-FBPN-RBF | No | Yes | Yes | Not discussed | BPN-NP | No | No | No | Difficult | The proposed methodology | Yes | Yes | Yes | Easy |
|
|