Research Article
A Capacitated Location-Allocation Model for Flood Disaster Service Operations with Border Crossing Passages and Probabilistic Demand Locations
Table 2
Data for quality of road construction.
| | HQ (%) | GQ (%) | AQ (%) | MNR (%) | MJR (%) | Score (%) of each area | |
| 1 | 0.38 | 40.91 | 37.5 | 20.19 | 0 | 275.46 | 0.089512 | 2 | 1.65 | 39.76 | 35.76 | 11.53 | 9.41 | 281.62 | 0.091514 | 3 | 0 | 11.76 | 28.43 | 25.49 | 34.31 | 382.32 | 0.124236 | 4 | 1.37 | 6.65 | 23.29 | 39.33 | 29.35 | 388.61 | 0.126280 | 5 | 2.96 | 20 | 28.89 | 24.44 | 23.7 | 345.89 | 0.112398 | 6 | 0.72 | 11.15 | 40.66 | 24.75 | 22.7 | 357.5 | 0.116171 | 7 | 2.78 | 59.45 | 30.87 | 6.45 | 0 | 240.09 | 0.078018 | 8 | 5.97 | 68.1 | 20.71 | 3.36 | 1.37 | 224.59 | 0.072981 | 9 | 1.54 | 70.51 | 26.15 | 1.79 | 0 | 228.17 | 0.074145 | 10 | 15.79 | 14.04 | 14.04 | 10.53 | 45 | 353.11 | 0.114744 |
|
|