Table of Contents Author Guidelines Submit a Manuscript
Mathematical Problems in Engineering
Volume 2013, Article ID 584393, 9 pages
http://dx.doi.org/10.1155/2013/584393
Research Article

Dynamic Intelligent Feedback Scheduling in Networked Control Systems

School of Information & Engineering, Huzhou Teachers College, Zhejiang 313000, China

Received 11 September 2013; Accepted 14 October 2013

Academic Editor: Zhengguang Wu

Copyright © 2013 Hui-ying Chen et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. P. Antsaklis and J. Baillieul, “Special issue on networked control systems,” IEEE Transactions on Automatic Control, vol. 49, no. 9, pp. 1421–1423, 2004. View at Publisher · View at Google Scholar · View at Scopus
  2. Bosch, “CAN specification (version 2.0),” 1991.
  3. R. A. Gupta and M.-Y. Chow, “Networked control system: overview and research trends,” IEEE Transactions on Industrial Electronics, vol. 57, no. 7, pp. 2527–2535, 2010. View at Publisher · View at Google Scholar · View at Scopus
  4. Z. W. Wang and H. T. Sun, “Control and scheduling co-design of networked control system: overview and directions,” in Proceedings of the International Conference on Machine Learning and Cybernetics, pp. 816–824, Xian, China, 2012.
  5. L. X. Zhang, H. J. Gao, and O. Kaynak, “Network-induced constraints in networked control systems—a survey,” IEEE Transactions on Industrial Informatics, vol. 9, no. 1, pp. 403–416, 2013. View at Publisher · View at Google Scholar
  6. Z. G. Wu, P. Shi, H. Su, and J. Chu, “Exponential synchronization of neural networks with discrete and distributed delays under time-varying sampling,” IEEE Transactions on Neural Networks and Learning Systems, vol. 23, no. 9, pp. 1368–1376, 2012. View at Publisher · View at Google Scholar
  7. Z. G. Wu, P. Shi, H. Su, and J. Chu, “Stochastic synchronization of Markovian jump neural networks with time-varying delay using sampled-data,” IEEE Transactions on Cybernetics, pp. 1–11, 2013. View at Publisher · View at Google Scholar
  8. F. Xia, S. B. Li, and Y. X. Sun, “A Neural network based feedback scheduler for networked control system with flexible workload,” Lecture Notes in Computer Science, vol. 3611, pp. 242–251, 2005. View at Publisher · View at Google Scholar
  9. S. H. Hong, “Bandwidth allocation scheme for cyclic-service fieldbus networks,” IEEE/ASME Transactions on Mechatronics, vol. 6, no. 2, pp. 197–204, 2001. View at Publisher · View at Google Scholar · View at Scopus
  10. H. S. Park, Y. H. Kim, D.-S. Kim, and W. H. Kwon, “A scheduling method for network-based control systems,” IEEE Transactions on Control Systems Technology, vol. 10, no. 3, pp. 318–330, 2002. View at Publisher · View at Google Scholar · View at Scopus
  11. M. S. Branicky, S. M. Phillips, and W. Zhang, “Scheduling and feedback co-design for networked control systems,” in Proceedings of the 41st IEEE Conference on Decision and Control, pp. 1211–1217, Las Vegas, Nev, USA, December 2002. View at Scopus
  12. J. Q. He and H. C. Zhang, “The study on scheduling optimization in a network control system based on genetic algorithms,” Industrial Instrumentation & Automation, vol. 36, no. 4, pp. 37–39, 2004. View at Google Scholar
  13. M. Velasco, J. M. Fuertes, C. Lin, P. Martí, and S. Brandt, “A control approach to bandwidth management in networked control systems,” in Proceedings of the 30th Annual Conference of the IEEE Industrial Electronics Society, pp. 2343–2348, Busan, Korea, November 2004. View at Publisher · View at Google Scholar · View at Scopus
  14. M. Velasco, P. Martí, and M. Frigola, “Bandwidth management for distributed control of highly articulated robots,” in Proceedings of the IEEE International Conference on Robotics and Automation, pp. 265–270, Barcelona, Spain, April 2005. View at Publisher · View at Google Scholar · View at Scopus
  15. Z. Li, W. Wang, and Y. Jiang, “Intelligent scheduling and optimisation for resource-constrained networks,” IET Control Theory and Applications, vol. 5, no. 12, pp. 2982–2992, 2010. View at Publisher · View at Google Scholar · View at Scopus
  16. Y. Wang, H. Cai, Q.-W. Chen, and W.-L. Hu, “Feedback scheduler design of networked control systems,” Acta Electronica Sinica, vol. 35, no. 2, pp. 379–384, 2007. View at Google Scholar · View at Scopus
  17. F. Xia, Y. X. Sun, and Y. C. Tian, “Fuzzy feedback scheduling of resource-constrained embedded control systems,” International Journal of Innovative Computing, Information and Control, vol. 5, no. 2, pp. 311–321, 2009. View at Google Scholar · View at Scopus
  18. C. Peng, D. Yue, Z. Gu, and F. Xia, “Sampling period scheduling of networked control systems with multiple-control loops,” Mathematics and Computers in Simulation, vol. 79, no. 5, pp. 1502–1511, 2009. View at Publisher · View at Google Scholar · View at Scopus
  19. Z. D. Tian, X. W. Gao, M. H. Shi, and K. Li, “Fuzzy feedback scheduler of resource constrained networked control system,” Electronic Machine and Control, vol. 17, no. 1, pp. 94–101, 2013. View at Google Scholar
  20. F. Xia, Feedback Scheduling of Real-Time Control Systems with Resource Constraints, Zhejiang University, Hangzhou, China, 2006.
  21. Z.-X. Li, W.-L. Wang, and W.-J. Hu, “Least squares support vector machines based predictive feedback scheduling for resource-constrained networks,” Control and Decision, vol. 25, no. 3, pp. 361–366, 2010. View at Google Scholar · View at Scopus
  22. Z.-J. Lu, J.-G. Yang, Q. Xiang, and X.-L. Wang, “Research on support vector machines based predictive model for yarn quality,” Control and Decision, vol. 22, no. 6, pp. 693–696, 2007. View at Google Scholar · View at Scopus
  23. C.-M. Li, J. Xiao, and Y. Zhang, “Approach of adaptive prediction control on networked control systems based on least-squares support vector machines,” Journal of System Simulation, vol. 19, no. 15, pp. 3494–3502, 2007. View at Google Scholar · View at Scopus
  24. F. Takens, “Detecting strange attractors in fluid turbulence,” in Dynamical Systems and Turbulence, pp. 366–381, Springer, Belin, Germany, 1981. View at Google Scholar
  25. J. Yépez, P. Martí, and J. M. Fuertes, “Control loop scheduling paradigm in distributed control systems,” in Proceedings of the 29th Annual Conference of the IEEE Industrial Electronics Society, pp. 1441–1446, Roanoke, Va, USA, November 2003. View at Scopus
  26. F. Xia, Z. Wang, and Y. Sun, “Simulation based performance analysis of networked control systems with resource constraints,” in Proceedings of the 30th Annual Conference of the IEEE Industry Electronics Society, pp. 2946–2951, Busan, Korea, November 2004. View at Scopus