Table of Contents Author Guidelines Submit a Manuscript
Mathematical Problems in Engineering
Volume 2013 (2013), Article ID 646241, 10 pages
http://dx.doi.org/10.1155/2013/646241
Research Article

Real-Time Gate Reassignment Based on Flight Delay Feature in Hub Airport

College of Civil Aviation, Nanjing University of Aeronautics and Astronautics, Nanjing 210016, China

Received 30 September 2013; Revised 30 October 2013; Accepted 31 October 2013

Academic Editor: Bin Yu

Copyright © 2013 Huawei Wang et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. S. Yan and C.-M. Chang, “A network model for gate assignment,” Journal of Advanced Transportation, vol. 32, no. 2, pp. 176–189, 1998. View at Google Scholar · View at Scopus
  2. B. Maharjan and T. I. Matis, “Multi-commodity flow network model of the flight gate assignment problem,” Computers & Industrial Engineering, vol. 63, no. 4, pp. 1135–1144, 2012. View at Google Scholar
  3. H. M. Genç, O. K. Erol, B. Eksin, M. F. Berber, and B. O. Güleryüz, “A stochastic neighborhood search approach for airport gate assignment problem,” Expert Systems with Applications, vol. 39, no. 1, pp. 316–327, 2012. View at Publisher · View at Google Scholar · View at Scopus
  4. C. H. Cheng, S. C. Ho, and C. L. Kwan, “The use of meta-heuristics for airport gate assignment,” Expert Systems with Application, vol. 39, no. 16, pp. 12430–12437, 2012. View at Google Scholar
  5. U. Dorndorf, F. Jaehn, and E. Pesch, “Modelling robust flight-gate scheduling as a clique partitioning problem,” Transportation Science, vol. 42, no. 3, pp. 292–301, 2008. View at Publisher · View at Google Scholar · View at Scopus
  6. C. H. Tang and W. C. Wang, “Airport gate assignment for airline-specific gates,” Journal of Air Transport Management, vol. 30, pp. 10–16, 2013. View at Google Scholar
  7. F. Jaehn, “Solving the flight gate assignment problem using dynamic programming,” Zeitschrift für Betriebswirtschaft, vol. 80, no. 10, pp. 1027–1039, 2010. View at Publisher · View at Google Scholar · View at Scopus
  8. B. Maharjan and T. I. Matis, “An optimization model for gate reassignment in response to flight delays,” Journal of Air Transport Management, vol. 17, no. 4, pp. 256–261, 2011. View at Publisher · View at Google Scholar · View at Scopus
  9. Y. Gu and C. A. Chung, “Genetic algorithm approach to aircraft gate reassignment problem,” Journal of Transportation Engineering, vol. 125, no. 5, pp. 384–389, 1999. View at Google Scholar · View at Scopus
  10. Y. Z. Hou, An Approach for Dynamic Airport Gate Assignments for Stochastic Flight Delays, National Central University, Jhongli, Taoyuan, 2007.
  11. C.-H. Tang, S. Yan, and Y.-Z. Hou, “A gate reassignment framework for real time flight delays,” 4OR, vol. 8, no. 3, pp. 299–318, 2010. View at Publisher · View at Google Scholar · View at Scopus
  12. C.-H. Tang, “A gate reassignment model for the taiwan taoyuan airport under temporary gate shortages and stochastic flight delays,” IEEE Transactions on Systems, Man, and Cybernetics A, vol. 41, no. 4, pp. 637–650, 2011. View at Publisher · View at Google Scholar · View at Scopus
  13. S. Yan and C.-H. Tang, “A heuristic approach for airport gate assignments for stochastic flight delays,” European Journal of Operational Research, vol. 180, no. 2, pp. 547–567, 2007. View at Publisher · View at Google Scholar · View at Scopus
  14. M. Şeker and N. Noyan, “Stochastic optimization models for the airport gate assignment problem,” Transportation Research E, vol. 48, no. 2, pp. 438–459, 2012. View at Publisher · View at Google Scholar · View at Scopus
  15. S. Yan, C.-Y. Shieh, and M. Chen, “A simulation framework for evaluating airport gate assignments,” Transportation Research A, vol. 36, no. 10, pp. 885–898, 2002. View at Publisher · View at Google Scholar · View at Scopus
  16. M. Dorigo, V. Maniezzo, and A. Colorni, “Ant system: optimization by a colony of cooperating agents,” IEEE Transactions on Systems, Man, and Cybernetics B, vol. 26, no. 1, pp. 29–41, 1996. View at Publisher · View at Google Scholar · View at Scopus
  17. A. Uǧur and D. Aydin, “An interactive simulation and analysis software for solving TSP using Ant Colony Optimization algorithms,” Advances in Engineering Software, vol. 40, no. 5, pp. 341–349, 2009. View at Publisher · View at Google Scholar · View at Scopus
  18. C. García-Martínez, O. Cordón, and F. Herrera, “A taxonomy and an empirical analysis of multiple objective ant colony optimization algorithms for the bi-criteria TSP,” European Journal of Operational Research, vol. 180, no. 1, pp. 116–148, 2007. View at Publisher · View at Google Scholar · View at Scopus
  19. V. T'kindt, N. Monmarché, F. Tercinet, and D. Laügt, “An Ant Colony Optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem,” European Journal of Operational Research, vol. 142, no. 2, pp. 250–257, 2002. View at Publisher · View at Google Scholar · View at Scopus
  20. S. Marimuthu, S. G. Ponnambalam, and N. Jawahar, “Threshold accepting and Ant-colony optimization algorithms for scheduling m-machine flow shops with lot streaming,” Journal of Materials Processing Technology, vol. 209, no. 2, pp. 1026–1041, 2009. View at Publisher · View at Google Scholar · View at Scopus
  21. Y. Gajpal and P. L. Abad, “Multi-ant colony system (MACS) for a vehicle routing problem with backhauls,” European Journal of Operational Research, vol. 196, no. 1, pp. 102–117, 2009. View at Publisher · View at Google Scholar · View at Scopus
  22. J. F. Tang, Y. Y. Ma, J. Guan et al., “A Max-Min Ant System for the split delivery weighted vehicle routing problem,” Expert Systems with Applications, vol. 40, no. 15, pp. 7468–7477, 2013. View at Google Scholar
  23. T. Keskinturk, M. B. Yildirim, and M. Barut, “An ant colony optimization algorithm for load balancing in parallel machines with sequence-dependent setup times,” Computers and Operations Research, vol. 39, no. 6, pp. 1225–1235, 2012. View at Publisher · View at Google Scholar · View at Scopus
  24. J. Behnamian, M. Zandieh, and S. M. T. F. Ghomi, “Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm,” Expert Systems with Applications, vol. 36, no. 6, pp. 9637–9644, 2009. View at Publisher · View at Google Scholar · View at Scopus