A New Approach to Fault Diagnosis of Power Systems Using Fuzzy Reasoning Spiking Neural P Systems
Table 1
Operation statistics of main protections of China state grid in 220 kV and above power systems from 2004 to 2009.
| Year | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | Average |
| Line | | | | | | | | Total faults | 29411 | 29291 | 26047 | 24685 | 36865 | 12347 | 26441 | Correct diagnosed faults | 29181 | 29234 | 26030 | 24666 | 36855 | 12345 | 26385.17 | Diagnostic accuracy/% | 99.22 | 99.81 | 99.93 | 99.92 | 99.97 | 99.98 | 99.79 |
| Bus | | | | | | | | Total faults | 90 | 120 | 112 | 122 | 159 | 89 | 115.33 | Correct diagnosed faults | 77 | 114 | 102 | 118 | 156 | 88 | 109.17 | Diagnostic accuracy/% | 85.56 | 95.00 | 91.07 | 96.72 | 98.11 | 98.88 | 94.65 |
|
|