Research Article

Peak Power Demand and Energy Consumption Reduction Strategies for Trains under Moving Block Signalling System

Figure 2

(a) Following trains’ SHB driving curves after train 1 stops for . (b) The position of train 3 when train 2 starts to move.
940936.fig.002a
(a)
940936.fig.002b
(b)