Research Article
Peak Power Demand and Energy Consumption Reduction Strategies for Trains under Moving Block Signalling System
Table 1
Running time of following train.
| (m) | (m/s) | (m) | Running time of the following train arrives at station A (s) |
| 400 | 16 | 82 | 40.26 | 400 | 12 | 138 | 39.82 | 400 | 8 | 178 | 39.5 | 400 | 4 | 202 | 39.42 | 400 | 0 | 210 | 39.38 |
|
|