Research Article
Peak Power Demand and Energy Consumption Reduction Strategies for Trains under Moving Block Signalling System
Table 3
Comparison of the graded ARL and SHB techniques.
| |
Arrival time of train 2 (s) | Arrival time of train 3 (s) | Peak power demand (kw/t) | Energy consumption (kw·h) | Stopping time before arrival (s) | Train 2 | Train 3 |
| Non-PDR | 289.38 | 338.76 | 25.1 | 15.9137 | 130 | 43.75 | Graded ARL | 297.78 | 400.36 | 22.07 | 46.3402 | 130 | 43.75 | SHB | 289.5 | 339.16 | 13.42 | 10.5016 | 65.66 | 0 |
|
|