Research Article
A Fuzzy-Neural Ensemble and Geometric Rule Fusion Approach for Scheduling a Wafer Fabrication Factory
Table 11
Comparison of the estimation performances of various approaches.
| Performance measure | BPN (the Levenberg-Marquardt algorithm) | FCM-BPN (the gradient descent algorithm) | FCM-BPN (the Levenberg-Marquardt algorithm) |
| MAE | 47 (hrs) | 79 | 43 | MAPE | 4.1% | 6.7% | 3.7% | RMSE | 70 (hrs) | 98 | 62 |
|
|