Research Article

A Fuzzy-Neural Ensemble and Geometric Rule Fusion Approach for Scheduling a Wafer Fabrication Factory

Table 2

The differences between the proposed methodology and the previous methods.

MethodWay of fusing rulesEstimating the remaining cycle timeOptimization methodHeuristicDigital manufacturing model is used forRequired evaluation rime

Hsieh et al. [5]NANANASimulationEvaluating/comparing scheduling performancesLengthy
Dabbas et al. [26]LinearNADOE + the desirability functionSimulationEvaluating/comparing scheduling performancesLengthy
Harrath et al. [7]LinearNAEnumerationAssociation ruleEvaluating/comparing scheduling performancesLengthy
Chen [29]NonlinearFCM-BPNMaximize the standard deviation of slacksNLPConfirmation studyModerate
The proposed methodologyNonlinearFCM-BPN ensembleMaximizing the geometric mean of the neighboring distances of slacksNLP + systematic procedureConfirmation studyShort