Research Article

A Nonlinear Optimization Technique of Tunnel Construction Based on DE and LSSVM

Table 1

Orthogonal scheme and calculated displacements.

Factor   (MPa)   (GPa) AZ  (mm)DZ  (mm)AB  (mm)BC  (mm)

1200.270.20.2370.057.13767.7810.795
2200.290.40.2569.503.54166.7410.050
3200.310.60.2769.182.34166.1310.230
4200.330.80.2968.911.74065.5410.806
5200.351.00.3168.651.37764.9211.537
6400.270.40.2738.303.49836.945.596
7400.290.60.2938.072.31236.525.503
8400.310.80.3137.911.71536.225.614
9400.331.00.2337.721.40836.005.675
10400.350.20.2538.486.98536.738.816
11600.270.60.3126.732.28825.753.839
12600.290.80.2326.551.76325.483.641
13600.311.00.2526.451.39825.273.785
14600.330.20.2727.306.94126.236.554
15600.350.40.2926.683.43825.365.531
16800.270.80.2520.581.75219.832.745
17800.291.00.2720.491.39019.662.836
18800.310.20.2921.436.89820.715.392
19800.330.40.3120.793.41219.854.382
20800.350.60.2320.472.33319.443.832
211000.271.00.2916.791.38116.172.261
221000.290.20.3117.796.84617.284.763
231000.310.40.2317.053.50816.363.295
241000.330.60.2516.822.32116.043.122
251000.350.80.2716.671.72615.833.095