Research Article
Hybrid Discrete Differential Evolution Algorithm for Lot Splitting with Capacity Constraints in Flexible Job Scheduling
Table 3
Cleaning time (unit: hour) while each product of different color depth is processed in the vat with the maximum output.
| Dye vat number/quantity | Minimum capacity, maximum capacity (kg) | Color depth of each product | ā | ā | 24 | 60 | 89 | 25 | 62 | 88 | 98 | 100 | 120 | 145 |
| /3 | 1, 10 | 0.1 | 0.15 | 0.25 | 0.15 | 0.5 | 0.25 | 0.3 | 0.3 | 0.35 | 0.45 | /1 | 5, 30 | 0.1 | 0.15 | 0.3 | 0.35 | 0.25 | 0.25 | 0.4 | 0.45 | 0.5 | 0.55 | /5 | 5, 50 | 0.2 | 0.3 | 0.45 | 0.2 | 0.3 | 0.45 | 0.5 | 0.5 | 0.6 | 0.65 | /1 | 10, 85 | 0.25 | 0.35 | 0.45 | 0.25 | 0.35 | 0.45 | 0.55 | 0.6 | 0.65 | 0.75 | /1 | 10, 90 | 0.3 | 0.45 | 0.55 | 0.3 | 0.45 | 0.55 | 0.65 | 0.65 | 0.8 | 0.8 | /7 | 20, 100 | 0.35 | 0.5 | 0.65 | 0.35 | 0.5 | 0.65 | 0.75 | 0.85 | 1.0 | 1.05 | /2 | 50, 500 | 0.45 | 0.65 | 0.8 | 0.45 | 0.65 | 0.8 | 0.95 | 0.95 | 1.15 | 1.2 |
|
|