Research Article
Multiobjective Synergistic Scheduling Optimization Model for Wind Power and Plug-In Hybrid Electric Vehicles under Different Grid-Connected Modes
Table 2
Wind power output and power load demand.
| Period | Wind power output/MW | Power demand/MW·h |
| 1 | 286 | 900 | 2 | 513.5 | 1000 | 3 | 533 | 1100 | 4 | 559 | 1200 | 5 | 520 | 1500 | 6 | 435.5 | 1700 | 7 | 383.5 | 1900 | 8 | 305.5 | 2100 | 9 | 182 | 2300 | 10 | 188.5 | 2500 | 11 | 169 | 2600 | 12 | 195 | 2700 | 13 | 169 | 2500 | 14 | 143 | 2300 | 15 | 214.5 | 2100 | 16 | 260 | 1800 | 17 | 240.5 | 1700 | 18 | 188.5 | 1900 | 19 | 136.5 | 2100 | 20 | 130 | 2500 | 21 | 214.5 | 2300 | 22 | 292.5 | 1900 | 23 | 423.8 | 1300 | 24 | 370.5 | 1000 |
|
|