Research Article
An Observer-Based Finite Control Set Model Predictive Control for Three-Phase Power Converters
Table 3
Time dependencies for the proposed algorithm.
| Module | Execution time s |
| Total algorithm | 33 | Sampling and A/D conversion | 5 | FCS-MPC strategy (including voltage loop and PLL) | 12.5 | Calculation delay compensation | 2 | Proposed observer | 3.5 | Others (protection, DAC, etc.) | 10 |
|
|