Research Article

A New Robust Controller with Applications to Bioreactors

Figure 2

Example : (a) output measurement [mmol/L] (solid line), desired output (dash-dot line), and estimated output (dotted line); (b) tracking error (solid line) and observer error (dash-dot line); (c) control input [day ].
375928.fig.002a
(a)
375928.fig.002b
(b)
375928.fig.002c
(c)