Research Article
Topological Effects and Performance Optimization in Transportation Continuous Network Design
Table 4
TSC of the network with different OD demands and budgets.
| Budget | TSC | OD | 100-20 | 100-40 | 100-60 | 100-80 | 100-100 |
| 150 | 432.44 | 584.10 | 865.89 | 1213.67 | 1853.30 | 250 | 431.25 | 579.45 | 793.35 | 1159.37 | 1636.84 | 350 | 410.91 | 560.11 | 743.75 | 1112.40 | 1509.32 |
|
|