Ultimate Capacity Analysis and Determination of the Position of Failure Surface for Uplift Piles

Table 1

Predicated and measured net uplift capacity of single pile.

L/d Expt results ( )Meyerhof method [12]Das method [13]Chattopadhyay method [14]Shanker method [4]Truncated method [17]Proposed method
( )relative error( )relative error( )relative error( )relative error( )relative error( )relative error

Das (1983) [13] expt results,  kN/m3, , ,  m, %
82725.74.8%25.74.8%40.750.7%2218.5%12.952.0%35.933.0%
126257.86.8%57.47.4%75.021.0%62.50.8%43.829.4%53.413.8%
16114102.89.8%92.818.6%108.35.0%133.016.6%103.79.0%126.310.7%
24180230.828.2%163.29.3%171.05.0%202.212.2%350.094.5%193.67.5%

Chattopadhyay and Pise (1986) [14] expt results,  kN/m3, , ,  m
10.57434.7853.0%34.853.0%705.4%23.568.2%18.774.7%49.732.8%
1612780.3636.7%79.6537.3%149.317.6%8235.4%65.848.2151.919.6%
26256217.215.2%173.532.2%298.316.5%141.044.9%29214.1%248.52.9%

Dash and Pise (2003) [16] expt results,  kN/m3, , ,  m, %
847.633.928.8%33.928.8%57.220.1%2351.6%16.365.7%62.130.4%
16142135.64.5%1345.6%166.217.0%1420.00%130.38.2%100.429.3%
2427130512.5%2594.4%262.53.1%21122.1%439.762.3%297.89.8%

Shanker et al. (2007) [4] expt results,  kN/m3, , ,  m, %
1017.329.369.4%29.369.3%35.7106.4%19.1910.9%15.79.2%17.11.2%
201121174.5%98.512.1%86.322.9%120.477.6%125.512.1%108.53.1%
30181.6266.546.8%1696.9%127.230.0%178.01.9%423.5133.2%233.128.3%