Research Article
Ultimate Capacity Analysis and Determination of the Position of Failure Surface for Uplift Piles
Table 1
Predicated and measured net uplift capacity of single pile.
| L/d | Expt results () | Meyerhof method [12] | Das method [13] | Chattopadhyay method [14] | Shanker method [4] | Truncated method [17] | Proposed method | () | relative error | () | relative error | () | relative error | () | relative error | () | relative error | () | relative error |
| Das (1983) [13] expt results, kN/m3, , , m, % | 8 | 27 | 25.7 | 4.8% | 25.7 | 4.8% | 40.7 | 50.7% | 22 | 18.5% | 12.9 | 52.0% | 35.9 | 33.0% | 12 | 62 | 57.8 | 6.8% | 57.4 | 7.4% | 75.0 | 21.0% | 62.5 | 0.8% | 43.8 | 29.4% | 53.4 | 13.8% | 16 | 114 | 102.8 | 9.8% | 92.8 | 18.6% | 108.3 | 5.0% | 133.0 | 16.6% | 103.7 | 9.0% | 126.3 | 10.7% | 24 | 180 | 230.8 | 28.2% | 163.2 | 9.3% | 171.0 | 5.0% | 202.2 | 12.2% | 350.0 | 94.5% | 193.6 | 7.5% |
| Chattopadhyay and Pise (1986) [14] expt results, kN/m3, , , m | 10.5 | 74 | 34.78 | 53.0% | 34.8 | 53.0% | 70 | 5.4% | 23.5 | 68.2% | 18.7 | 74.7% | 49.7 | 32.8% | 16 | 127 | 80.36 | 36.7% | 79.65 | 37.3% | 149.3 | 17.6% | 82 | 35.4% | 65.8 | 48.2 | 151.9 | 19.6% | 26 | 256 | 217.2 | 15.2% | 173.5 | 32.2% | 298.3 | 16.5% | 141.0 | 44.9% | 292 | 14.1% | 248.5 | 2.9% |
|
Dash and Pise (2003) [16] expt results, kN/m3, , , m, % | 8 | 47.6 | 33.9 | 28.8% | 33.9 | 28.8% | 57.2 | 20.1% | 23 | 51.6% | 16.3 | 65.7% | 62.1 | 30.4% | 16 | 142 | 135.6 | 4.5% | 134 | 5.6% | 166.2 | 17.0% | 142 | 0.00% | 130.3 | 8.2% | 100.4 | 29.3% | 24 | 271 | 305 | 12.5% | 259 | 4.4% | 262.5 | 3.1% | 211 | 22.1% | 439.7 | 62.3% | 297.8 | 9.8% |
| Shanker et al. (2007) [4] expt results, kN/m3, , , m, % | 10 | 17.3 | 29.3 | 69.4% | 29.3 | 69.3% | 35.7 | 106.4% | 19.19 | 10.9% | 15.7 | 9.2% | 17.1 | 1.2% | 20 | 112 | 117 | 4.5% | 98.5 | 12.1% | 86.3 | 22.9% | 120.47 | 7.6% | 125.5 | 12.1% | 108.5 | 3.1% | 30 | 181.6 | 266.5 | 46.8% | 169 | 6.9% | 127.2 | 30.0% | 178.0 | 1.9% | 423.5 | 133.2% | 233.1 | 28.3% |
|
|