A New Approach to Determine the Critical Path in Stochastic Activity Network

Table 1

The comparison of running time between the proposed method (M-LCTA) and MCS.

Index123456789101112131415 (100 nodes)

M-LCTA 0.0030.0060.010.0120.0150.0180.0190.0210.0310.0280.0340.0790.0990.1320.31
MCS0.81.52.33.34.44.55.26.46.79.210.717.744.6199.81840.6