Research Article
A New Approach to Determine the Critical Path in Stochastic Activity Network
Table 1
The comparison of running time between the proposed method (M-LCTA) and MCS.
| Index | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 (100 nodes) |
| M-LCTA | 0.003 | 0.006 | 0.01 | 0.012 | 0.015 | 0.018 | 0.019 | 0.021 | 0.031 | 0.028 | 0.034 | 0.079 | 0.099 | 0.132 | 0.31 | MCS | 0.8 | 1.5 | 2.3 | 3.3 | 4.4 | 4.5 | 5.2 | 6.4 | 6.7 | 9.2 | 10.7 | 17.7 | 44.6 | 199.8 | 1840.6 |
|
|