A New Approach to Determine the Critical Path in Stochastic Activity Network

Table 10


547627.tab.0010
The shortest path:
The longest path:

Index1234567

Mean 50.0 33.3 25.0 40.0 28.6 22.2 20.0

Index891011121314

Mean 16.7 33.3 50.0 66.7 50.0 40.0 33.3