A New Approach to Determine the Critical Path in Stochastic Activity Network

Table 13


547627.tab.0013
The shortest path:
The longest path:

Index1234567

Mean 40.0 50.0 45.0 54.9 30.0 35.0 40.0

Index891011121314

Mean 25.0 30.0 40.0 50.0 26.0 28.0 20.0

Index15161718192021

Mean 25.0 30.0 20.0 18.0 36.0 45.0 15.0

Index222324

Mean 59.9 25.0 46.1