Research Article

Mixed Replenishment Policy for ATO Supply Chain Based on Hybrid Genetic Simulated Annealing Algorithm

Table 2

The parameters of the suppliers.

Supplier Holding cost (per producing cost per time) Setup cost
(per time)
Producing cost (per time)Producing capability (units per year)

0.21 500 70 2000
0.22 700 115 2200
0.21 750 100 3000
0.20 740 90 2900
0.23 730 95 2700
0.21 450 60 1800
0.22 740 110 2800
0.20 480 65 1900
0.23 460 68 1850
0.24 760 80 3100
0.25 600 77 2300
0.20 800 105 3500
0.23 900 84 4000
0.26 860 66 3800
0.21 770 73 3200
0.23 420 82 1600
0.24 710 98 2500
0.22 880 120 3900
0.22 720 88 2600
0.21 830 62 3600