Research Article

Reliability Modeling and Assessment of Component with Multiple Weak Sites under Complex Loading

Figure 5

The relation between reliability and LR at SM 5.0 and different loading times.
(a) 1000 times
(b) 10000 times
(c) 50000 times
(d) 100000 times
(e) 200000 times
(f) 500000 times
(g) 1000000 times