Comparative Analysis for Robust Penalized Spline Smoothing Methods
Figure 3
Box plots of run times using (a) penalized LS-estimation, (b) penalized -estimation, (c) penalized -estimation, and (d) the comparison of median run time for the simulated samples from each of the 9 distribution scenarios with replicate number .