Research Article

Comparative Analysis for Robust Penalized Spline Smoothing Methods

Figure 3

Box plots of run times using (a) penalized LS-estimation, (b) penalized -estimation, (c) penalized -estimation, and (d) the comparison of median run time for the simulated samples from each of the 9 distribution scenarios with replicate number .
642475.fig.003a
(a)
642475.fig.003b
(b)
642475.fig.003c
(c)
642475.fig.003d
(d)