D-FNN Based Modeling and BP Neural Network Decoupling Control of PVC Stripping Process
Table 1
Parameters of PVC string tower.
| Parameter | Scope | Alarm value | Normal scope | Real value |
| Temperature in tower top | 0–150°C | Upper limit: 110°C Lower limit: 70°C | 80–105°C | 85°C | Temperature in tower bottom | 0–150°C | Upper limit: 130°C Lower limit: 100°C | 105–113°C | 107°C | Pressure in tower top | 0-0.1 MPa | Upper limit: 0.08 MPa Lower limit: 0.02 MPa | 0.03–0.06 MPa | 0.03 MPa | Pressure difference in tower | 0–60 MPa | Upper limit: 30 MPa Lower limit: 5 MPa | 10–25 MPa | 15 MPa | Steam flow rate | 0–4000 kg/h | Upper limit: 3500 kg/h Lower limit: 1000 kg/h | 1500–3000 kg/h | 2200 kg/h | Inlet slurry flow rate | 0–80 m3/h | Upper limit: 70 m3/h Lower limit: 15 m3/h | 35–50 m3/h | 40–45 m3/h | Steam pressure in tower | 0–0.6 MPa | Upper limit: 0.5 MPa Lower limit: 0.15 MPa | 0.35–0.4 MPa | 0.38 MPa |
|
|