Research Article

Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

Table 6

Judgment matrixes and weights of “technology risk” criteria.

Technology risk Local weight

1.000.672.222.221.251.671.111.002.500.14
1.501.002.863.331.672.501.431.333.330.20
0.450.351.001.110.590.800.560.501.250.07
0.450.300.901.000.560.710.500.451.110.06
0.800.601.701.801.001.330.830.802.000.11
0.600.401.251.400.751.000.670.671.430.09
0.900.701.802.001.201.501.000.912.220.13
1.000.752.002.201.251.501.101.002.500.14
0.400.300.800.900.500.700.450.401.000.06

, CI = 0.000731, CR = 0.000504 < 0.1