Research Article
Performance and Risk Assessment of Soil-Structure Interaction Systems Based on Finite Element Reliability Methods
Table 7
Comparison of mean outcrossing rate and mean outcrossing events obtained by using FORM, OPS, and MCS.
| Time (sec) | Mean outcrossing rate | Failure probability (%) | Number of simulations | FORM | OPS | FORM | OPS | MCS | OPS | MCS |
| 0.5 | | | 0.66 | 0.39 | 0.14 | 1631 | 2800 | 1.0 | | | 3.31 | 2.17 | 1.99 | 1809 | 2800 | 1.5 | | | 8.51 | 4.91 | 4.05 | 2398 | 2800 | 2.0 | | | 15.73 | 7.87 | 6.75 | 2300 | 2800 | 2.5 | | | 22.81 | 11.32 | 9.24 | 3058 | 2800 | 3.0 | | | 28.98 | 14.80 | 12.37 | ā | 2800 |
|
|