Mathematical Problems in Engineering / 2014 / Article / Fig 11

Research Article

Upper Bound Solution for the Face Stability of Shield Tunnel below the Water Table

Figure 11

The relationship between the average seepage force and the water table.

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.