Research Article

The Integration of Group Technology and Simulation Optimization to Solve the Flow Shop with Highly Variable Cycle Time Process: A Surgery Scheduling Case Study

Table 1

The five groups.

Categories12345

Expressionāˆ’0.001 + ERLA (28.7, 2)āˆ’0.001 + LOGN (119, 226)5 + WEIB (91, 0.856)5 + WEIB (162, 1.2)5 + GAMM (94.3, 1.51)