Research Article

Transportation Network Design considering Morning and Evening Peak-Hour Demands

Table 5

Network design simultaneously considering two peak-hour demands (Scheme C).

Commute peakTTCLinkPath
NumberExpanded capacity ( )Flow ( )NumberLink componentFlow ( )Equilibrium cost ( )

Morning peak902.09216.15216.19811-26.19816.757
26.20126.1982318.80416.758
30.00018.8043410.00010.055
420.72520.0004220.00011.499
51–410.00015.313

Evening peak877.03816.15220.00011-20.00015.631
26.20110.0002310.00015.141
30.00010.0003425.00011.407
420.72545.0004210.00010.032
51–420.00017.007

Sum1779.130