Research Article

A New Hybrid Intelligent Algorithm for Fuzzy Multiobjective Programming Problem Based on Credibility Theory

Table 5

Fuzzy simulation results of the first ten sample points.

Sample point (SP) The expected value of unavailability The expected value of cost

SP1 135.7135 units
SP2 0.0169 57.1931 units
SP3 105.1304 units
SP4 0.0018 176.9077 units
SP5 187.3301 units
SP6 161.0648 units
SP7 0.0035 250.7263 units
SP8 0.0047 179.1654 units
SP9 0.0959 213.2756 units
SP10 0.0021 338.1837 units