Research Article
A Two-Stage Model for Project Optimization in Transportation Infrastructure Management System
Table 1
Results of new method.
| Year | No. of segments to be treated | Length of road to be treated (m) | Area of pavement to be treated (m2) | Total maintenance cost (10,000) | Average PCI of pavement network | Average PII of pavement network |
| 2005 | 60 | 17859 | 187210 | 1320 | 89.6 | 483649.2 | 2006 | 56 | 17234 | 223318 | 1470 | 88.3 | 361548 | 2007 | 63 | 17298 | 221853 | 1540 | 87.1 | 571428.7 | 2008 | 81 | 23026 | 303050 | 1450 | 86.8 (minimal) | 888703.5 | 2009 | 89 | 23103 | 307059 | 1700 | 87 | 782662.4 | 2010 | 112 | 28812 | 334866 | 1670 | 88.3 | 780185.2 | 2011 | 85 | 22393 | 310335 | 1670 | 88.8 | 755266.7 | 2012 | 80 | 22567 | 328590 | 1660 | 89.3 | 675452.1 | 2013 | 98 | 22582 | 272024 | 1700 | 90.6 | 520031.3 | 2014 | 75 | 22688 | 319542 | 1580 | 91.1 (minimal) | 504012.8 | Total | 799 | 217562 | 2807847 | 15760 | 88.69 | 6322940 |
|
|