Table 6

Comparative analysis of the construction period [20].

Structural
type
Construction period Comparison
Typical
floor
30-story apartment building

Bearing wall7 days/1 floor210 Days100.0%
Hybrid precast frame10 days/3 floors100 Days47.6%