Research Article

Research on Construction Optimization of Three-Connected-Arch Hydraulic Underground Cavities Considering Creep Property

Figure 13

Anchor rod axial force after the excavation is completed.
967975.fig.0013a
(a) Side cavity method
967975.fig.0013b
(b) Middle cavity method
967975.fig.0013c
(c) PBA completed