Research on Construction Optimization of Three-Connected-Arch Hydraulic Underground Cavities Considering Creep Property

Figure 9

Creep curve at vault monitoring point of excavated cavity.
967975.fig.009a
(a) Side cavity method
967975.fig.009b
(b) Middle cavity method
967975.fig.009c
(c) PBA