Research Article

Research on Construction Optimization of Three-Connected-Arch Hydraulic Underground Cavities Considering Creep Property

Table 5

Comparative table of phase-excavation surrounding rock stress in different construction methods.

Construction methodMaximum pressure stress (MPa)Maximum tension stress (MPa)Ratio

Side cavity method2.040.583.52
Middle cavity method2.040.1612.75
PBA method3.300.2612.69