Stochastic Optimal Dispatch of Virtual Power Plant considering Correlation of Distributed Generations
Table 5
The VPP optimal results in confidence levels.
| Confidence levels | Wind farm (kW) | Photovoltaic station (kW) | Diesel generator (kW) | Fuel cell (kW) | Power output to the power grid (kW) | Costs (Ұ) | Profits (Ұ) |
| 0.90 | 118.24 | 280.43 | 251.33 | 497 | 100 | 830 | 106 | 0.95 | 117.04 | 278.08 | 254.68 | 497 | 100 | 840 | 96 | 0.97 | 116.42 | 276.85 | 256.73 | 497 | 100 | 847 | 89 | 0.99 | 115.86 | 276.76 | 257.38 | 497 | 100 | 867 | 87 |
|
|