Research Article

The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model

Table 5

AMPL/CPLEX results for the set of instances with .

Comb.
Opt.Gap(%)CPUOpt.Gap(%)CPU

1000.22100.511.90
1000.4890.85585.87
1000.6080.611271.04
1000.66100.3215.49
1001.4681.521414.51
10012.3063.771519.31
1000.96100.08525.46
1004.3760.792052.72
1007.8351.381821.96