Research Article

Extreme Learning Machine for Reservoir Parameter Estimation in Heterogeneous Sandstone Reservoir

Figure 6

Schematic of architecture of the ELM network model. Node number of the input layer is 5, and porosity and permeability are the two nodes at the output layer. Number of hidden layer nodes is to be settled by OP-ELM method.