Research Article

Computing and Controlling Basins of Attraction in Multistability Scenarios

Table 3

Summary of FPIC requirements in coexistence control of two period-6 cycles.

Maps

(0.2023, 0.7974)
(0.6568, 0.3329)
(0.6025, 0.7689)
(0.7793, 0.4991)
(0.4506, 0.8426)
(0.8655, 0.2996)