Research Article
A Decomposition-Based Two-Stage Optimization Algorithm for Single Machine Scheduling Problems with Deteriorating Jobs
Table 5
Comparison between the performances of the two-stage method and GTS.
| Problem | 100 jobs | Problem | 200 jobs | Two-stage method | GTS | Improvement (%) | Two-stage method | GTS | Improvement (%) |
| 1 | 529251 | 543701 | 2.73 | 1 | 2772482 | 2693236 | −2.86 | 2 | 580368 | 561897 | −3.18 | 2 | 2254343 | 2646620 | 17.40 | 3 | 471791 | 531532 | 12.66 | 3 | 2549536 | 2808366 | 10.15 | 4 | 467193 | 552274 | 18.21 | 4 | 2701978 | 2582402 | −4.43 | 5 | 498979 | 502002 | 0.61 | 5 | 2214216 | 2653940 | 19.86 | 6 | 592447 | 542141 | −8.49 | 6 | 2991533 | 3263023 | 9.08 | 7 | 458492 | 486609 | 6.13 | 7 | 2066705 | 2344396 | 13.44 | 8 | 590894 | 554199 | −6.21 | 8 | 2408844 | 2555122 | 6.07 | 9 | 572005 | 636890 | 11.34 | 9 | 2331178 | 2802221 | 20.21 | 10 | 366301 | 402192 | 9.80 | 10 | 2401338 | 2679454 | 11.58 |
| Problem | 500 jobs | Problem | 1000 jobs | Two-stage method | GTS | Improvement (%) | Two-stage method | GTS | Improvement (%) |
| 1 | 16526240 | 18984561 | 14.88 | 1 | 82521970 | 89691988 | 8.69 | 2 | 16917170 | 19958887 | 17.98 | 2 | 78710890 | 84133722 | 6.89 | 3 | 17430260 | 19615766 | 12.54 | 3 | 83526650 | 89416688 | 7.05 | 4 | 17960130 | 19779356 | 10.13 | 4 | 82014700 | 86538534 | 5.52 | 5 | 17383250 | 19476219 | 12.04 | 5 | 76615210 | 84045424 | 9.70 | 6 | 16520930 | 18978797 | 14.88 | 6 | 79475530 | 86345229 | 8.64 | 7 | 15694230 | 18608654 | 18.57 | 7 | 82407780 | 84327182 | 2.33 | 8 | 18541230 | 21285024 | 14.80 | 8 | 73426980 | 80531920 | 9.68 | 9 | 20040810 | 22896113 | 14.25 | 9 | 81376060 | 90411751 | 11.10 | 10 | 17562700 | 19684769 | 12.08 | 10 | 72945010 | 80092001 | 9.80 |
|
|