Summary of remodeling design solutions.
| Items | The subject status for remodeling | Alternative method—CEM A | Alternative method—CEM B |
| Sectional view of the installed pipe | | | |
| Features of the construction method | A sewage pipeline is installed on the ceiling of the household in downstairs | Repair of existing shaft space; piping the sewage pipeline in subject floor by constructing the additional 50 mm thick flooring | Shaft removal; sewage pipeline buried in a noise-proof wall |
| Major limitations of the technique | Difficulty in maintenance and issue of noise occurrence | Easy maintenance and relatively less noise | Easy maintenance, perfect noise blocking, and increase of useful workspace due to reduction in shaft space |
|
|