Research Article
Turnback Capacity Assessment and Delay Management at a Rail Transit Terminal with Two-Tail Tracks
Figure 2
Two turnback operation procedures of a terminal with two-tail tracks.
(a) Turnback operation with one tail track (T1) |
(b) Turnback operation with two trail track (T1 + T2) |