Research Article
Modeling the Multicommodity Multimodal Routing Problem with Schedule-Based Services and Carbon Dioxide Emission Costs
Table 5
Values of the loading/unloading and inventory costs.
| Service | Container feet | Loading/unloading costs | Pickup/delivery costs | Inventory costs | (unit: ¥/TEU) | (unit: ¥/TEU) | (unit: ¥/TEU-h) |
| Road | 20 ft | 25 | — | — | 40 ft | 19 | — | — |
| Rail | 20 ft | 195 | 225 | 3.125 | 40 ft | 146.25 | 337.5 | 3.125 |
|
|