20 instances of 50 jobs. The processing time drawn from the interval . The instances that are not shown in the table were solved optimally.

Emerging job Overflow job Aprox. ratio

1 688 89 935 817 82 830 65 1406 895 −13 78 2301 2223 28.5 1.0350
3 94 72 1291 155 34 164 62 2162 226 −9 71 2388 2317 32.6 1.0306
5 705 85 1795 929 31 953 36 1373 989 −24 60 2362 2302 38.3 1.0260
6 1032 82 2463 2291 43 2326 −7 0 2319 −35 28 2319 2291 81.8 1.0122
7 1737 89 2014 1877 36 1882 69 444 1951 −5 74 2395 2331 31.5 1.0274
8 1366 66 1925 1544 88 1573 29 753 1602 −29 58 2355 2297 39.6 1.0252
10 2067 62 2269 2127 52 2146 14 180 2160 −19 33 2340 2307 69.9 1.0143
16 291 79 1454 320 27 355 27 1971 382 −35 62 2353 2291 36.9 1.0270