Research Article

The Power Purchase Optimization Model in China considering the Renewable Energy Risks under Different Risk Preferences

Table 13

The risk tolerance of the grid company when (unit: 100 million yuan).

The endurance threshold of income fluctuationHigh enduranceMedium enduranceLow enduranceExtremely low endurance

2.5252.522.5152.51