The Power Purchase Optimization Model in China considering the Renewable Energy Risks under Different Risk Preferences
Table 3
The power quantity constraints of the grid company (unit: 100 GWh).
|
Type |
Value |
Power purchased from the extraprovincial market | Power purchased from the intraprovincial market | Hydropower | Thermal power | Wind power | Photovoltaic generation |
| Long-term contract | The most probable value | 0.3047 | 0.22 | 0.32 | 0.31 | 0.31 | The minimal value | 0.3047 | 0.22 | 0.32 | 0.31 | 0.31 | The maximal value | 0.3047 | 0.22 | 0.32 | 0.31 | 0.31 |
| Short-term contract | The most probable value | 0.45 | 0.2443 | 0.3329 | 0.3249 | 0.3249 | The minimal value | 0.448 | 0.2393 | 0.3279 | 0.3229 | 0.3229 | The maximal value | 0.452 | 0.2493 | 0.3379 | 0.3269 | 0.3269 |
|
|