Research Article

The Power Purchase Optimization Model in China considering the Renewable Energy Risks under Different Risk Preferences

Table 9

The risk tolerance of the grid company when (unit: 100 million yuan).

The endurance threshold of income fluctuationHigh enduranceMedium enduranceLow enduranceExtremely low endurance

2.5152.512.5052.5