Research Article
Periodic Switched Control of Dual-Rate Sampled-Data Systems
Table 1
Solvability comparison between Proposition
3 with
and Corollary
5 with
.
| | 0.24 s | 0.27 s | 0.30 s | 0.36 s |
| Proposition 3 (dual-rate) | Feasible | Feasible | Feasible | Feasible |
| Corollary 5 (single-rate) | Feasible | Feasible | Infeasible | Infeasible |
|
|